Utility Reports

Utility search reports for underground services.

Download the details for utility networks – gas, electric, water, sewage, telecoms and fibre-optics, transportation, and oil and fuel pipelines.

PAS 128 compliant multi-utility reports from £325+VAT. Same day options.

  • • Utility Essentials for the basics.
    • Utility Premium for complex sites.

About Utility Reports

Emapsite’s Utility Reports ensure compliance with:

- BS PAS-128 Standard, Survey Type D, QL-D

- HSE Regulations (including HSG47 & CDM)

- New Roads & Street Works Act 1991 (NRSWA 91)

Order a Utility Report

What is PAS 128? PAS 128 is the British Standards Institution (BSI) standard that guides the mapping of utilities. PAS 128 provides confidence.
Clients who work to PAS 128 have the assurance their contractors are meeting the right criteria for detection, verification, and location of utility assets.

Utility Essentials
This utility search report details the five key services – gas, electricity, water, sewage and BT Openreach.

Download Sample: PDF

Same Day Utility Essentials
Utility Essentials, delivered the same day*.

Download Sample: PDF

Utility Premium
A comprehensive utility search report for all categories. It details main and tertiary gas and electricity supplies, mains water and sewage, oil and fuel pipelines, telecoms and fibre-optics, and transportation networks. 

Download Sample: PDF

Utility Fast-Track
Utility Premium, delivered in five working days*.

Download Sample: PDF

Utility Report Digitised
All the details from your requested utility report, provided as an overlay to OS Mastermap. A clear, concise and interactive digital drawing. 

Download Sample: CAD/DWG

Terms and Conditions apply. 

Utility Reports are ideal for:

  • Reducing project planning time

  • Minimising risk

  • Gaining confidence before excavation work

  • Use in CAD (Digitised version)

  • Complying with health and safety regulation

  • Avoiding surprises

  • Complying with BSI Standard - PAS 128

 

Order a Utility Report

 

Underground Utilities map

Utility Essentials

​This report gives visibility of the 5 key services – Gas, Electric, Water, Sewage and BT Openreach.

Product Details

The Essentials report is collated and delivered in 5 working days* and is ideal for remote sites where only the main utility providers are likely to be present or projects where the aim is merely to check the availability of the main utilities (water/sewer, gas, electric and BT) e.g. in the planning stages of a new development.

*Due to the extensive nature of some searches, the number of utilities searched, and the response timescales imposed by some utility suppliers, it can happen that not all responses are received within the relevant timeframe. When this does occur, your report will be delivered with all available content as requested, and a final report will be delivered as soon as the outstanding information has been received.

Technical Details

Supplier
Technics
Coverage
GB
Formats Available
PDF
Licence Options
Perpetual
Delivery Timescale
5 working days

Related Products

Download Samples

Underground Utilities map

Same Day Utility Essentials

All the information of our Utility Essentials, delivered on the day of order.

Product Details

The Same Day Essentials report provides utility company responses the same (working) day if ordered before 12pm, or within the first 24 hours if ordered after 12pm*.

The Essentials report is collated and delivered in 5 working days* and is ideal for remote sites where only the main utility providers are likely to be present or projects where the aim is merely to check the availability of the main utilities (water/sewer, gas, electric and BT) e.g. in the planning stages of a new development.

*Due to the extensive nature of some searches, the number of utilities searched, and the response timescales imposed by some utility suppliers, it can happen that not all responses are received within the relevant timeframe. When this does occur, your report will be delivered with all available content as requested, and a final report will be delivered as soon as the outstanding information has been received.

 

Technical Details

Supplier
Technics
Coverage
GB
Formats Available
PDF
Licence Options
Perpetual
Delivery Timescale
Same day/24 hours

Related Products

Download Samples

Underground Utilities map

Utility Premium

Provides comprehensive information about all services affecting your site including Gas and Oil pipelines, mains Water and Sewage, Telecoms and fibre-optic cables.

Product Details

Provides comprehensive information about the services affecting your site including main and tertiary gas and electricity supplies, mains water and sewage, oil and fuel pipelines, telecoms and fibre-optics, and transportation networks.

Information is gathered, collated and supplied as a single report within 10 working days*.

This report is ideal when comprehensive information is required for your site, ensuring you are managing your risk and avoiding expensive delays.

*Due to the extensive nature of some searches, the number of utilities searched, and the response timescales imposed by some utility suppliers, it can happen that not all responses are received within the relevant timeframe. When this does occur, your report will be delivered with all available content as requested, and a final report will be delivered as soon as the outstanding information has been received.

Technical Details

Supplier
Technics
Coverage
GB
Formats Available
PDF
Licence Options
Perpetual
Delivery Timescale
10 working days

Related Products

Download Samples

Underground Utilities map

Utility Fast-Track

All the information of our Utility Premium report, delivered in 5 working days.

Product Details

The Utility Fast-track report delivers all the information of our Premium report (Gas, Electric, Water, Sewage, Telecoms/Fibre, Oil/Fuel and Transportation Networks) WITH all supplier responses collated in a report and delivered to you within 5 working days*

*Due to the extensive nature of some searches, the number of utilities searched, and the response timescales imposed by some utility suppliers, it can happen that not all responses are received within the relevant timeframe. When this does occur, your report will be delivered with all available content as requested, and a final report will be delivered as soon as the outstanding information has been received.

Technical Details

Supplier
Technics
Coverage
GB
Formats Available
PDF
Licence Options
Perpetual
Delivery Timescale
Draft in 5 working days

Related Products

Download Samples

Underground Electric Utilities map

Utility Singles - Electricity

Our Utility Singles reports enable you to request data for a single utility type.

Product Details

Electricity information can be ordered as an individual search; providing a cost–effective method of obtaining relevant information if you only need to check the availability/position of a particular utility to plan a new development or make changes to an existing development.

The Utilities Singles report is delivered within 10 working days. Due to the extensive nature of some searches, the number of utilities searched, and the response timescales imposed by some utility suppliers, it can happen that not all responses are received within the relevant timeframe. When this does occur, your report will be delivered with all available content as requested, and a final report will be delivered as soon as the outstanding information has been received.

 

 

 

 

Technical Details

Supplier
Technics
Coverage
GB
Formats Available
PDF
Licence Options
Perpetual
Delivery Timescale
10 working days

Related Products

Download Samples

Underground Gas Utilities map

Utility Singles - Gas

Our Utility Singles reports enable you to request data for a single utility type.

Product Details

Gas information can be ordered as an individual search; providing a cost–effective method of obtaining relevant information if you only need to check the availability/position of a particular utility to plan a new development or make changes to an existing development.

The Utilities Singles report is delivered within 10 working days. Due to the extensive nature of some searches, the number of utilities searched, and the response timescales imposed by some utility suppliers, it can happen that not all responses are received within the relevant timeframe. When this does occur, your report will be delivered with all available content as requested, and a final report will be delivered as soon as the outstanding information has been received.

Technical Details

Supplier
Technics
Coverage
GB
Formats Available
PDF
Licence Options
Perpetual
Delivery Timescale
10 Working days

Related Products

Download Samples

Underground Telecoms Utilities map

Utility Singles - Telecoms

Our Utility Singles reports enable you to request data for a single utility type.

Product Details

Telecoms information can be ordered as an individual search; providing a cost–effective method of obtaining relevant information if you only need to check the availability/position of a particular utility to plan a new development or make changes to an existing development.

The Utilities Singles report is delivered within 10 working days. Due to the extensive nature of some searches, the number of utilities searched, and the response timescales imposed by some utility suppliers, it can happen that not all responses are received within the relevant timeframe. When this does occur, your report will be delivered with all available content as requested, and a final report will be delivered as soon as the outstanding information has been received.

Please note, a search of GTT (previously known as Vtesse Networks Ltd) is now included in this report.

 

Technical Details

Supplier
Technics
Coverage
GB
Formats Available
PDF
Licence Options
Perpetual
Delivery Timescale
10 Working days

Related Products

Download Samples

Underground Water Utilities map

Utility Singles - Water

Our Utilities Singles reports enable you to request data for a single utility type.

Product Details

Water & Sewage information can be ordered as an individual search; providing a cost–effective method of obtaining relevant information if you only need to check the availability/position of a particular utility to plan a new development or make changes to an existing development.

The Utilities Singles report is delivered within 10 working days. Due to the extensive nature of some searches, the number of utilities searched, and the response timescales imposed by some utility suppliers, it can happen that not all responses are received within the relevant timeframe. When this does occur, your report will be delivered with all available content as requested, and a final report will be delivered as soon as the outstanding information has been received.

 

 

 

 

 

Technical Details

Supplier
Technics
Coverage
GB
Formats Available
PDF
Licence Options
Perpetual
Delivery Timescale
10 Working days

Related Products

Download Samples

Digitised Underground Utilities map

Utility Report Digitised

Your utilities data supplied as digitised CAD layers

Product Details

Digitising Utilities data into CAD is one of those business-critical but time-consuming jobs that many could well do without, which is why you can opt for us to supply your utilities data as digitised CAD layers.

Data is collected from all relevant service providers and is digitised into CAD layers, supplied as a digital product to be used alongside your Utility Report PDF file. Prices will be quoted individually, but are competitive, and in many cases are cheaper than in-house CAD teams.

We have three different options for levels of detail/information for digitisation: Primary, Intermediated and Advanced. Please contact us for more information on what each includes.

Technical Details

Supplier
emapsite
Coverage
GB
Scale
Based on utility plans
Formats Available
CAD formats
Licence Options
Perpetual
Delivery Timescale
On request

Related Products

OS MasterMap Topography Layer

Download Samples